Challenges:
Rumble has fabricated and constructed numerous well pads for multiple clients, ranging from single remote pads to 10-well greenfield and brownfield expansion pads. This project involved a 10-well pad that faced several challenges, as it was constructed during the spring breakup season.
Efficiency:
Working in sync with the completions team and under a tight timeframe, Rumble leveraged its total station to precisely shoot all existing tie-in points. We then generated our own Navisworks model to ensure flawless constructability.
Execution:
By utilizing both our shop and yard fabrication teams simultaneously with our field crews, Rumble successfully brought the pad online within a strict timeline. Additionally, we managed all major trades, from pile drivers to insulators, ensuring efficient project execution.